Saturday, November 15, 2008

windows and basement/garage flooring


putting in windows














the biggest and heaviest window - good thing we had a crane



















the window that took the most work - our bedroom window














the street's a long ways down














all windows in except front basement window - left out for pouring basement floor













basement floor prep for in-floor heating














piping for basement floor














piping in cement for the basement floor














smoothing the basement floor after dark

2nd floor framing



view from lake














garage rafters













2nd floor framing















master suite - east wall













north wall - 2nd bedroom














outside - west wall - back yard














outside - south wall














outside - east wall - faces lake














inside framing














crane to hoist rafters














Hoisting rafters

Saturday, October 25, 2008

framing the first floor and garage



















flooring for the first floor
















Dad's little step stool gives access to the first floor




















two walls up

































three walls up













four walls up - looking out the front door













view from the lake














garage in front is framed
















steps to gain access to the second floor


















Wednesday, October 15, 2008

basement framing

preparing to frame
















delivery of wood















south basement wall















east basement wall - facing the lake














center walls














That's the Boss!














that's a heavy board!















I-joists for main floor












basement from front